After-sales Service: | Perfect After-Sales |
---|---|
Warranty: | 1 Year |
Certification: | ISO, SGS |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Technical Parameter of 388-T Backhoe Loader | |
Transport Dimension | |
Overall Operating Weight | 7800KG |
L*W*H | 6150×2250×3763mm |
Wheel base | 2200mm |
SMin. Ground Clearance | 300mm |
Bucket Capacity | 1.0m3 |
Breakout Force | 38KN |
Loading Lifting Capacity | 2500KG |
Bucket Dumping Height | 2742mm |
Bucket Dumping Distance | 1062mm |
Backhoe Capacity | 0.3m3 |
Max. Digging Depth | 4082mm |
Optional Digging Depth | 5200mm (flexible and can be extended) |
Swing Angle of backhoe | 190o |
Max. Pulling Force | 39KN |
Engine | |
Brand/Model | YUCHAI 4A105Z-T20 |
Type | Turbocharging Four-Stroke |
Rated Power | 75KW/100HP |
Cylinder-Inside Diameter*Stroke | 4-105 |
Rated Speed | 2400r/min |
Min. Fuel Consumption | 235g/ km. h |
Max .Torque | 310N.M |
Displacement | 4..3L |
Steering System | |
Model of Steering Device | BZZ5-250 |
Steering Angle | ±36 o |
Min. turning radius | 6581mm |
Pressure of the system | 12Mpa |
Axle | |
Manufacturer | Feicheng Axle Factory |
Main Transmission Type | Double Reduction |
Final Reducer | Single Stage Final Reducer |
Rated Loader of Axle | 4/18.5t |
Transmission System | |
Torque Converter | |
Model | YJ280 |
Type | Single-stage Three Elements |
Max. Efficiency | 84.4% |
Inlet Pressure | 0.4-0.55Mpa |
Outlet Pressure | 0.25-0.3Mpa |
Cooling Method | Oil-cooling Pressure Circulation |
Gearbox | |
Type | Fixed Shaft Power Transmission |
Gears | Two forward, Two reverse gears |
Oil Pressure of Clutch | 1373Kpa-1569 Kpa |
Max.Speed | 22Km/h |
Tyre | |
Model | 14-17.5/19.5L-24 |
Pressure of Front wheel | 0.22 Mpa |
Pressure of Back Wheel | 0.22Mpa |
Brake System | |
Service Brake | Air Over Oil Caliper Brake |
External Type | |
Self-regulation | |
Self-balance | |
Emergency Brake | Operation Power Implementing brake |
Manual Operation Power Terminating Brake | |
Hydraulic System | |
Digging Power of Excavator Grab | 46.5KN |
Digging Power of Dipper | 31KN |
Bucket Lifting Time | 5.4S |
Bucket Lowering Time | 3.1S |
Bucket Discharge Time | 2.0S |
The parameters or configuration are subject to change without notice. |